Compliance Package

Compliance Package; (includes submitting of compliance testing)

This package includes all your site assets that are required by law to be tested in accordance to relevant Australian standards and complies with manufactures service recommendations, it also ensures your high demand assets that service multiple units/customers are serviced to maintain manufacturer's warranties, increase longevity and reduce running costs.

 Compliance Asset/Plant in package may include;

  • Backflow Prevention Test and Certification;
  • Thermostatic Mixing Valve (TMV) Testing;
  • Eye wash bay/shower;
  • All Pump Maintenance;
  • Hot Water/Solar Hot Water Unit Service;
  • Jet cleaning of Stormwater/Sewerage Branch.

Recommended service frequency;

Preventative Maintenance Compliance Package;

Frequency

Maintenance Required

Backflow Prevention Test and Certification

12 Monthly

  • Test as per Australian Standards
  • Submitted reports to authority’s

Thermostatic Mixing Valve (TMV) Test, Certification

12 Monthly

  • Test as per Australian Standards

Eye wash bay/shower Test and Certification                                                  

6 Monthly

  • Test as per Australian Standards

All Pump Maintenance and Report

  • Rainwater Pumps (+ UV if fitted)
  • Cold Water Booster Pump
  • Pool Pump
  • Stormwater/Grey Water Pump
  • Sewer/Black Water Pump
  • Under bench Sewer Pump
  • Hot Water Circulation Pump

6 Monthly

  • As recommended by manufacturer
  • Inspect for correct operation
  • Inspect for leaks
  • Check inlet and outlet pressure gauges
  • Check Oil levels (if required)
  • Ohms Test and document
  • Check control panel operations (if connected)
  • Check warning lights and alarms (if connected)

 

All Hot Water Unit Maintenance and Report

  • Instantaneous Systems,
  • Storage Systems (Electric and Gas),
  • Holding/Buffer Tanks
  • Solar Systems,

12 Monthly

  • Check pressure relief valve for operation
  • Check for leaks
  • Activate relief valve (replace if defective)
  • Ensure that the pressure setting is compatible

Jet cleaning of Stormwater/Sewerage Branch

12 Monthly

  • Jet clean branch drain
  • Remove and report all debris
  •  Camera line if blockage detected

 

Set Order: 